Target Dismantling and Cleanup at the Port | 11.09.2026
Following their removal from the water on 26 August, the targets were dismantled and processed at the port. The 5-liter plastic containers and PVC poles were recovered for reuse in future campaigns,...
UAV Survey and Target Removal | 26.08.2026
At around 10:00 in the morning, a UAV survey was conducted using the DJI Mavic 3 Multispectral to inspect each deployed target and capture video footage for further documentation. In the afternoon,...
5th Overpass | 14–15.08.2026
No UAV survey was conducted during this acquisition period due to team members’ personal scheduling commitments. Satellite acquisition dates for the 5th overpass: Sentinel-2: 14.08.2026...
4th Overpass and UAV Survey | 03.08.2026
The team conducted the 5th UAV survey using the MicaSense P Dual sensor at flight altitudes of 60 and 120 meters. At each altitude, the UAV made back-and-forth passes over the targets to collect...
2nd Inspection of PLP Targets | 02.08.2026
The team visited the targets by boat to inspect their condition following the recent repairs and changes to their configuration. The inspection confirmed that all targets remained in their intended...
3rd Overpass and UAV Survey | 30.07.2026
The team conducted the 4th UAV survey using the MicaSense P Dual sensor at flight altitudes of 60 and 120 meters. At each altitude, the UAV made back-and-forth passes over the targets to collect...
Repair and Reconfiguration of PLP Targets | 22.07.2026
The team carried out further repairs and cleaning to improve the stability of the targets. Earlier field observations showed that wind and waves had affected their positions and shapes. To address...
Satellite Observations and UAV Survey | 17.07.2026
The team conducted the 3rd UAV survey using the MicaSense P Dual sensor at flight altitudes of 60 and 120 meters. At each altitude, the UAV made 3 back-and-forth passes over the targets to collect...
Repair of PLP Targets | 16.07.2026
The team repaired and cleaned the targets to improve their condition and stability. The team added twenty new 5-liter plastic bottles to replace missing flotation units and help the targets float....
1st Inspection of PLP Targets | 14.07.2026
The team visited the deployed targets by boat to inspect their condition ahead of the planned repair and cleaning activities. During the inspection, the team checked for missing flotation units,...


