Transportation for disassembly
October marked the wrap-up of PLP2021. On Thursday the 7th of October we transported the target from the deployment area to the location it was assembled in June to proceed with the disassembly. On...
Measurement #22 04.10.2021
On Monday 04/10/2021 we performed the 22nd Sentinel 2 data acquisition for PLP2021. Due to windy conditions no UAS data were acquired. Metadata acquisition included wind speed and direction, light...
Measurement #21 29.09.2021
The scheduled removal of the target for the 29th of September was postponed due to adverse weather conditions. Cloud cover over the deployment area did not allow for the acquisition of useable...
Measurement #20 24.09.2021
On Friday 24/09/2021 we performed the 20th data acquisition for PLP2021. Sentinel 2 multispectral data of the HDPE mesh target were acquired, along with very high resolution images from a...
Measurement #19 19.09.2021
The 19th data acquisition for PLP2021 took place on Sunday 19/09/2021. Data acquisition included Sentinel 2 multispectral data of the HDPE mesh and wooden plank mixed target, along with very high...
Measurement #18 14.09.2021
The 18th data acquisition for PLP2021 took place on Tuesday 14/09/2021. Sentinel 2 multispectral data of the HDPE mesh and wooden plank mixed target, along with very high resolution images from a DJI...
Measurement #17 09.09.2021
The 17th data acquisition for PLP2021 took place on Thursday 09/09/2021. Data acquisition included Sentinel 2 multispectral imagery of the HDPE mesh and wooden plank mixed target, along with very...
Measurement #16 04.09.2021
The 16th data acquisition for PLP2021 took place on Saturday 04/09/2021. The weather was windy, i.e. 4-5 Beaufort, (8.5 m/sec wind speed). The wooden target was removed from the experiment area....
Measurement #15 30.08.2021
The 15th data acquisition for PLP2021 took place on Monday 30/08/2021. A number of 4L containers had been placed additionally the previous day, effectively keeping the mesh to surface level....
Measurement #14 25.08.2021
The 14th data acquisition for PLP2021 took place on Wednesday 25/08/2021. A number of 4L containers had been replaced the previous day, effectively raising the mesh back to surface level. More...