3rd data acquisition | 26.06.22
On Sunday 26th of June we performed the 3rd data acquisition for PLP2022. Sentinel 2, Pleiades, UAS multi-spectral, thermal and RGB data were acquired. Ancillary data including wind speed, light...
2nd data acquisition | 21.06.22
The second data acquisition for PLP22 took place on the 21st of June. Sentinel-2 satellite data, along with very-high-resolution multi-spectral, RGB and thermal data using drone-borne imagers on...
Up up we go! | 18.06.22
On Saturday 18th of June 2022, conditions were highly windy in the Gulf of Gera. As a result, our inflatable target was catching wind and was lifted off the water surface, becoming airborne and...
1st data acquisition | 16.06.22
Thursday the 16th of June was the first data acquisition day of PLP2022. Sentinel-2 satellite data, along with very-high-resolution multi-spectral, RGB and thermal data using drone-borne imagers on...
Target deployment | 15.06.22
On the 15th of June we deployed the two 7 m diameter white HDPE mesh targets in the Gulf of Gera. We towed the targets from their construction site to the anchoring area close to the small harbour of...
2nd meeting PLP2022 | 10.06.22
On the 10th of June we had the first official field day of the PLP2022. We met up at Skala Loutron in the Gulf of Gera to construct two circular, 7m diameter, white HDPE mesh targets that will be...
1st meeting PLP2022 | 07.06.22
PLP2022 kicked-off on Tuesday the 7th of June 2022 with a first gathering and briefing of the student volunteers and the project team. We discussed our main goals for the 2022 acquisition campaign,...
Transportation for disassembly
October marked the wrap-up of PLP2021. On Thursday the 7th of October we transported the target from the deployment area to the location it was assembled in June to proceed with the disassembly. On...
Measurement #22 04.10.2021
On Monday 04/10/2021 we performed the 22nd Sentinel 2 data acquisition for PLP2021. Due to windy conditions no UAS data were acquired. Metadata acquisition included wind speed and direction, light...
Measurement #21 29.09.2021
The scheduled removal of the target for the 29th of September was postponed due to adverse weather conditions. Cloud cover over the deployment area did not allow for the acquisition of useable...