Measurement #10 31.07.2021
On Saturday 31/07/2021 we performed the 10th data acquisition for PLP2021. Data acquisition included Sentinel 2 multispectral data of the two large area HDPE mesh and wooden targets, along with...
Measurement #9 26.07.2021
Monday 26/07/2021 was the 9th data acquisition for PLP2021. Data acquisition includes Sentinel 2 multispectral data of the two large area HDPE mesh and wooden targets, along with very high...
Measurement #8 21.07.2021
On Wednesday 21/07/2021 we performed the 8th data acquisition for PLP2021. Sentinel 2 multispectral data of the two large area targets were acquired, along with very high resolution images from...
Measurement #7 16.07.2021
Friday 16/07/2021 was the seventh data acquisition day for PLP2021. Sentinel 2 multispectral data of the two large area targets were acquired, along with very high-resolution images from a DJI...
Measurement #6 11.07.2021
On Sunday 11/07/2021 we performed the sixth data acquisition for PLP2021. Sentinel 2 multispectral data of the two large area targets were acquired, along with very high resolution images from a DJI...
Measurement #5 06.07.2021
Tuesday 06/07/2021 was the fifth data acquisition for PLP2021. Sentinel 2 multispectral data of both the two large area targets (HDPE mesh and wooden plank/natural debris simulator) were acquired,...
Measurement #4 01.07.2021
Thursday 01/07/2021 was the fourth data acquisition for PLP2021. This was the last acquisition with the 8 square targets built for the REACT project. The 8 targets were removed after Sentinel 2...
Measurement #3 26.06.2021
Saturday 26/06/2021 was the third data acquisition for PLP2021. Sentinel 2 multispectral data of both the two large area targets (HDPE mesh and wooden plank/natural debris simulator) and the 8...
Measurement #2 21.06.2021
Tuesday 21/06/2021 was the second acquisition day of PLP2021. Sentinel 2 data of the deployment area containing both the HDPE mesh and the natural debris targets were acquired. In addition to the 2...
Target 2 Placement 17.06.2021
On Thursday 17/06/2021 we deployed the wooden 28 m target in the Gulf of Gera. A group of 3 MRSG team members, one Department of Marine Sciences student volunteer and a professional diver worked for...


